Method Statement for Utility Surveys A. Conduit Condition Evaluation (CCE (CCTV & ME)) Download B. Manhole Internal Condition Survey (MHICS) Download C. Utility Survey (Pipe Cable Locator Survey, PCL) (US(PCL)) Download D. Water Leakage Detection and Control (WLD) Download E. Advanced Leakage Detection of Buried Water Carrying Services Affecting Slopes (BWCS) Download